In the non-air-conditioned storage area, we dropped by about 5 degrees. Real working comfort for the teams.
Retail, Retail · 2,500 m² treated
Site manager · Retail · 2,500 m² treated

Covalba makes high-performance reflective roof coatings for industrial, logistics, and commercial buildings. 500+ roofs coated, on every kind of substrate.
Réponse personnalisée sous 48h

No reflective coating: the roof soaks up heat
Your team slows down
Once it hits 28°C inside, the work gets harder.
Your energy bill climbs
Chillers max out and the AC runs nonstop.
Your waterproofing wears out fast
At 70°C up top, your roof's waterproofing ages twice as fast.

With a reflective roof coating: solar reflection
Our polyurethane resin — 10 years in the making — bounces back up to 94% of the sun's heat. Your roof surface drops from 70°C to 35°C. No major work, no downtime.
Request a quote
Winter sun doesn't heat your roof.
In winter, the sun sits low. It hits the walls, not the roof. Your roof barely sees any direct sun, so white or black, it does almost nothing to warm the inside.
In spring and fall, CovaTherm might cost you a little heat for a few days a year. That's nothing next to what you save all summer.
Industry sectors
Every sector comes with its own constraints: lines that can't shut down, the cold chain in logistics, hygiene rules in food & beverage, manufacturing standards in pharma, team comfort in commercial buildings. Our coatings fit your building, not the other way around.

Improve occupant comfort

Cut your refrigeration costs

Control your energy costs

Cut your refrigeration costs

Improve indoor comfort in summer

Protect livestock and crops from heat

Welcome your visitors in the cool

Keep GMP areas cool

Protect sensitive processes
Join the Covalba network
How it works
A primer, a resin and a topcoat that guarantee 10 years of performance for your roof.
Request a quote
Adapts to the existing substrate. Every roof has its own chemistry, and every chemistry calls for its own primer. It's this invisible layer that guarantees the adhesion of the entire system. The primer creates a chemical bridge between your existing waterproofing and the reflective resin. Without it, nothing holds. With the right primer, the system is bonded to your roof for at least 10 years.
"The wrong primer and the system blisters and peels inside a few months. It's the number-one reason cheap reflective coatings fail: one primer for every roof. We match the primer to the substrate, every time."
Maxime Bourassin, founder
The heart of the system. It bounces sunlight back instead of soaking it up. The roof surface drops from 70°C to 35°C, so heat stops getting into your building. Not all reflective resins are equal. There are two families: acrylic resins (like the paint on your walls) and polyurethane resins (technical chemistry, tougher). The resin you pick decides everything: performance, lifespan, how well it shrugs off the weather.
"90% of the market sells general-purpose acrylic at €15/m². It lasts 2 to 5 years. We formulate polyurethane resins that last 8 to 10 years. SRI 118 after aging: a record. The difference is the chemistry."
Maxime Bourassin, founder
A clear topcoat that shields the resin from UV, dirt and early aging. It's the system's invisible armor. UV wrecks everything: plastics, paints, resins. A roof takes the full hit, 12 hours a day, 365 days a year. The topcoat soaks up the UV so the resin doesn't, and keeps the reflectivity going. It's the difference between 5 years and 20 years.
"Without protection, even a good resin ends up yellowing after 3-4 years. CovaTherm 20 with finishing topcoat delivers 20 years of measured performance. That's why we're the only ones to claim an SRI of 118 after aging."
Maxime Bourassin, founder

Investment
You could re-roof or put in industrial air-conditioning, but that's slow, disruptive and expensive. A reflective roof coating fixes it now.
€20-22/m²
Air-conditioning
€80-150/m²
New membrane
€80-100/m²
Full re-roofing
€150/m²
Reduces indoor temperature
Reduces the energy bill
No interruption to operations
Protects the existing waterproofing
No recurring charges
Pays for itself in under 2 years
Compatible with older buildings
No machinery on the roof
Fast application, no structural work
€20-22/m²
AC
€80-150/m²
Membrane
€80-100/m²
Re-roof
€150/m²
Reduces indoor temperature
Reduces the energy bill
No interruption to operations
Protects the existing waterproofing
No recurring charges
Pays for itself in under 2 years
Compatible with older buildings
No machinery on the roof
Fast application, no structural work
A reflective coating is more than a heat shield. By bouncing back UV and easing thermal shock, it adds 10 years to your waterproofing. You take the heat out today AND push your full roof renovation down the road. Two problems solved, one investment.
5 / 5
Google rating · Verified customers
+500
roofs coated
since 2011
+1M
m² coated
10 years
in the making
high-performance resins
Competition
The real cost of a reflective roof coating shows up over time. With Covalba, you cool your building with the coating that costs the least over a full 10 years.
Resin used by 90% of competitors
Prix au m²
~15 €
Durée de vie
3-5 ans
Coût réel sur 10 ans
25-30 €/m²
Yellows in 2-3 years
Loses 30-50% of reflectivity
Re-application required
Durable reflective protective resin
Prix au m²
20-22 €
Durée de vie
8-10 ans
Coût réel sur 10 ans
20-22 €/m²
Maintains its performance over time
20-year anti-UV topcoat (CovaTherm 20)
SRI 118 after aging
Price per m² means nothing without lifespan.
Estimate my budget
Certifications & warranties
Compatible with ISO 50001, BREEAM, LEED
Fits into your existing building certification programs.
10-year contractual warranty
Written warranty on reflective performance and adhesion.
Measured and documented performance
SRI verified after accelerated aging, reflectance data provided on request.
Customer results
Across more than 1 million m² we've already coated, the results show up the very first summer. Three straight-talk testimonials from managers of industrial and commercial sites.
In the non-air-conditioned storage area, we dropped by about 5 degrees. Real working comfort for the teams.
Retail, Retail · 2,500 m² treated
Site manager · Retail · 2,500 m² treated
On the dispatch docks, we went from 15 to 8-10 degrees. The goods are subjected to less thermal shock.
Logistics warehouse, Logistics warehouse · 3,000 to 3,500 m²
Management · Logistics warehouse · 3,000 to 3,500 m²
We gained 13 degrees in the showroom. For our staff, summer has become far more pleasant.
Commercial showroom, Showroom · Glass roof and main roof treated
Showroom manager · Showroom · Glass roof and main roof treated
The process
It all happens outside. You keep working as usual, and your certifications and processes never miss a beat.
A technician analyzes your roof and quantifies your savings.
The project is organized around your constraints. Zero interruption.
The rigs stay at the foot of the building. Only the hoses go up. No load on your waterproofing, no risk to the structure. The job takes 3 to 5 days.
You notice the difference from the very first summer. Measurement sensors available as an option.
Average duration: 3 days · No interruption to operations
We visit, we assess, we quote
Our difference
Resins formulated in a specialized lab, a method proven on more than 500 roofs, wherever the heat hits hardest.
Bituminous membrane, steel deck, flat roof... Our system adapts to every substrate without major preparatory work.
From preparation to handover, the system applies fast and frees up your site quickly.
Our resins are formulated and produced in a specialized partner laboratory. Full traceability, quality controlled on every batch.
Primer, resin and topcoat designed to work together. Each layer is calibrated for the performance and durability of the complete system.
FAQ
If your question isn't here, write to us or fill out the form. We respond within 48h.
Get a tailored estimate for your project in under 72h. We reply within 48h, no commitment.
Dossier
A reflective roof coating is one of the best ways to take the heat out of a commercial or industrial building. It's been standard practice in the US for more than twenty years, it's well backed by research, and it costs a fraction of industrial air-conditioning or a full waterproofing redo. Here's what to know before you start.
Two properties decide how well a reflective roof coating performs: solar reflectance and thermal emissivity.
Solar reflectance is how much sunlight a surface bounces back instead of soaking up. Ordinary white paint manages 70 to 80% when new, then fades fast as it gets dirty and chalks. A good reflective coating starts above 90% and stays there, thanks to its pigments and an anti-UV topcoat.
Thermal emissivity is how readily the surface sheds the little heat it does absorb, as infrared. The best coatings clear 0.90.
Put the two together and you get the SRI (Solar Reflectance Index) — the ASTM E1980 number the industry rates coatings by. CovaTherm 20 comes in at SRI 119 new, and 118 after accelerated aging in a QUV chamber. On a peak summer day a dark roof can hit 70 to 80 °C; a reflective one stays about ten degrees above the air temperature, so far less heat ever reaches the building.
Six benefits we can measure — in the research and on our own jobs:
It's not a fix for everything. Three limits to know up front:
Reflective coatings aren't all the same. Four things decide how one actually performs — and how long it lasts:
A professional job runs in five steps, done by trained applicators:
It all goes on in dry weather, 10 to 35 °C. A typical 1,000 m² roof takes 3 to 5 days, and your operation never stops. Crews are trained to work safely up top.
A reflective coating isn't the only way to cool a building. But it beats insulation and air-conditioning on three counts: cost, how fast it goes in, and payback.
| Criterion | Reflective coating | Exterior insulation | Air-conditioning |
|---|---|---|---|
| Cost per m² | €20 to €22 | €80 to €100 | Low to buy, costly to operate |
| Project duration | 3 to 5 days | 2 to 4 weeks | Fast installation |
| Energy savings | 15 to 40% | 20 to 50% | None (increases the bill) |
| Durability | 8 to 20 years | 20 to 30 years | 10 to 15 years |
| Interruption to operations | No | Yes | Yes |
| Average ROI | 36 months | 8 to 12 years | Never |
A reflective coating pays back fastest, with nothing torn off and no downtime. For an industrial or commercial building over ten years old, it's the cheapest way to drop the indoor heat and buy the roof more years.
Beyond the building itself, a reflective roof feeds the bigger picture: less air-conditioning, lower cooling emissions, and a more comfortable place to work.
City-scale research all lands in the same place: cover enough industrial and commercial roofs and you offset a real share of urban warming, shave AC demand, and save lives in a heat wave. For one building, it's a smart investment. For a city, it's a public-health move.
Are you a materials distributor, a waterproofing merchant or a roofing company? Stock our reflective roof coatings and give your customers a high-performance solution.
